PROJECTS

Radium impacted clock factory - Waterbury, CT

Authored and successfully implemented the first Radium Cleanup Plan for a Non-Military Radium Site under the jurisdiction of the NRC.  The seven story 50,000 square foot building was structure underwent extensive remediation to meet Connecticut DEEP criteria of 19 mrem/year TEDE.  A total of 4,600 square feet of flooring and 1,000 square feet of brick/concrete required remediation or removal to achieve unrestricted release of the building.

Soils Remediation at a Former Clock Manufacturer - Chelsea, MA

Responsible for delineation of radium contamination in soils and coordination of direct waste disposal of 3,200 cubic yards of radioactive and mixed waste.  Oversite of an onsite laboratory for Gamma Spectroscopy of soil and prescreening of FSS samples.  Designed and implemented FSS soil survey for unrestricted release of the site under Massachusetts Radiation Control Program.   

BASF Plainville Site - Plainville MA

Radiological Contractor in charge of implementing the approved Decommissioning Plan for restricted release of the property.  This included GPS surveys of land areas to define targeted cleanup so remaining soils met the site-specific DCGLs after removal operations were complete.  Operation of an onsite laboratory for GS of soil and pre-screening of FSS samples.  Assembly of comprehensive FSS Report for the site detailing the removal operations and demonstrating that remaining onsite contamination meets criteria for restricted release.

Pharmaceutical R&D Campus Closure and Radioactive Material License Termination

The campus operated a broad scope radioactive materials license issued by the NRC for decades.  The project had a tight timeline with significant penalties if the license was not terminated.  We were successful in terminating the license meeting the integrated project schedule.